#6 · Cancelled
- 生效日期
- 2017年2月5日
- 收到
- 2016年12月8日
CY7 · Lower Adlington – Croston
Service withdrawn, partially replaced with revised 113 and 8A
Operating between Lower Adlington and Croston given service number CY7 / 7 effective from 05 February 2017.
注册本地公交服务
CY7
历史注册:未列在发布者当前的 RegisteredOnly 快照中。这并不确定当前的时刻表或车辆分配。
7 记录
发布者提供的变体,按最新变体编号排列。具有相同变体编号的不同行会被保留;未重建缺失的历史更改。
CY7 · Lower Adlington – Croston
Service withdrawn, partially replaced with revised 113 and 8A
Operating between Lower Adlington and Croston given service number CY7 / 7 effective from 05 February 2017.
7 · Lower Adlington – Croston
Revised route and timetable
Operating between Lower Adlington and Croston given service number 7 effective from 04-Apr-2016. To amend Route and Timetable.
7 · Chorley – Croston
Revised route and timetable
Operating between Chorley and Croston given service number 7 effective from 18-Oct-2015. To amend Route and Timetable.
7 · Chorley – Coppull
bridge repair work postponed to later in year
Operating between Chorley and Coppull given service number 7 effective from 25-Jan-2015. To amend Route and Timetable.
7 · Chorley – Coppull
railway bridge closure at Church Lane, Charnock Richard
Operating between Chorley and Coppull given service number 7 effective from 25-Jan-2015. To amend Route and Timetable.
7 · Chorley – Coppull
Market St , Chorley closed for 6 months
Operating between Chorley and Coppull given service number 7 effective from 09-Jul-2014. To amend Route and Timetable.
7 · Chorley – Croston
transfer from PC0000043
From: Chorley To: Croston Via: Name or No: 7 Service Type: Normal Stopping Effective Date: 27-May-2013 Other Details: transfer from PC0000043
官方Traffic Commissioner公共数据。快照更新2026年9月8日。 Traffic Commissioners / DVSA · CC BY ↗