Servizz tal-karozzi tal-lokal reġistrat

PF0007038/43

1

Servizz tal-karozza tal-linja
1
Minn
Skegness Interchange
Sa
Chapel St Leonards (multiple stops)
permezz ta’
Winthorpe. Ingoldmels
Data effettiva
March 28, 2026
Status
Registered

Storja tar-reġistrazzjoni

Il-kontenut uffiċjali tal-veduta jinżamm bil-lingwa s-sors. It-tikketti u l-ispjegazzjonijiet tal-paġni jiġu tradotti.

Rekords ta’ 95

Varjazzjonijiet ipprovduti mill-pubblikatur, numru tal-varjazzjoni l-ġdida l-ewwel. Ringieli differenti bl-istess numru ta' varjazzjoni jiġu preservati; l-ebda bidliet storiċi nieqsa ma jiġu rikostruwiti.

#94 · Registered

Data effettiva
March 28, 2026
Irċevut
February 13, 2026

1 · Skegness InterchangeChapel St Leonards (multiple stops)

permezz ta’ Winthorpe. Ingoldmels

Timetable variation. Revised timetables to operate normal Skegness seasonal summer service levels (V94).

Operating between Skegness Interchange and Chapel St Leonards (multiple stops) given service number 1 effective from 28 March 2026. To amend Timetable.

#93 · Registered

Data effettiva
November 3, 2025
Irċevut
September 12, 2025

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Winthorpe. Ingoldmels

(V93) Revised timetables to operate normal Skegness seasonal winter service levels.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 effective from 03 November 2025. To amend Timetable.

#92 · Registered

Data effettiva
April 5, 2025
Irċevut
February 20, 2025

1 · Skegness InterchangeChapel St Leonards Bus Station

permezz ta’ Winthorpe. Ingoldmels

Route, Start point, stopping places, and timetable variation To register a revised summer increased frequency and timetable (V92 03/2025).

Operating between Skegness Interchange and Chapel St Leonards Bus Station given service number 1 effective from 05 April 2025. To amend Route, Start & Finish Point, Stopping Places and Timetable.

#91 · Registered

Data effettiva
October 28, 2024
Irċevut
September 20, 2024

1A · Skegness InterchangeChapel Point, Chapel St Leonards

permezz ta’ Winthorpe. Ingoldmels

Timetable variation (V91 12/2024). To register a revised winter timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel Point, Chapel St Leonards given service number 1A / 1 effective from 28 October 2024. To amend Timetable.

#90 · Registered

Data effettiva
July 22, 2024
Irċevut
July 4, 2024

1 · Skegness InterchangeChapel Saint Leonards

permezz ta’ Winthorpe. Ingoldmels

Route and timetable variation (V90 07/2024). Amended summer timetable to improve punctuality in the high season.

Operating between Skegness Interchange and Chapel Saint Leonards given service number 1 effective from 22 July 2024. To amend Route and Timetable.

#89 · Registered

Data effettiva
March 23, 2024
Irċevut
February 9, 2024

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Winthorpe. Ingoldmels

To register summer season timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 effective from 23 March 2024. To amend Timetable.

#88 · Registered

Data effettiva
October 30, 2023
Irċevut
September 14, 2023

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Winthorpe. Ingoldmels

Revised registration to register winter season timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 effective from 30 October 2023. To amend Timetable.

#87 · Registered

Data effettiva
April 22, 2023
Irċevut
April 19, 2023

1A · Skegness InterchangeChapel St Leonards

permezz ta’ Acacia Avenue

To register summer season timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1A / 1 effective from 22 April 2023. To amend Timetable.

#86 · Withdrawn

Data effettiva
April 1, 2023
Irċevut
February 23, 2023

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Acacia Avenue

To Register summer season timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

#85 · Withdrawn

Data effettiva
April 1, 2023
Irċevut
February 15, 2023

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Acacia Avenue

To Register summer season timetable. Hail and ride on all sections of the route where traffic and safety conditions allow.

#84 · Expired

Data effettiva
December 24, 2022
Irċevut
December 19, 2022
Data ta' tmiem
January 3, 2023

1, 1A · Skegness InterchangeChapel St Leonards

permezz ta’ Acacia Avenue

To register an update to Christmas and New Year Service Information.

Operating between Skegness Interchange and Chapel St Leonards given service number 1, 1A / 1 effective from 24 December 2022. To amend Timetable.

#83 · Registered

Data effettiva
October 31, 2022
Irċevut
September 9, 2022

1 · Skegness InterchangeChapel St Leonards

permezz ta’ Acacia Avenue

To register Winter timetables.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 effective from 31 October 2022. To amend Timetable.

#82 · Registered

Data effettiva
April 2, 2022
Irċevut
February 17, 2022

1 · Skegness InterchangeChapel St Leonards

Revised timetable for seasonal change.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 / SK_1_1A effective from 02 April 2022. To amend Timetable.

#81 · Registered

Data effettiva
January 2, 2022
Irċevut
November 18, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Timetable Variation

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 02 January 2022. To amend Timetable.

#80 · Expired

Data effettiva
October 4, 2021
Irċevut
September 28, 2021
Data ta' tmiem
March 31, 2022

SK_1_1A · Skegness InterchangeChapel St Leonards

Timetable Variation

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 04 October 2021. To amend Timetable.

#79 · Expired

Data effettiva
September 6, 2021
Irċevut
August 27, 2021
Data ta' tmiem
December 31, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to seasonal changes.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 06 September 2021. To amend Timetable.

#78 · Withdrawn

Data effettiva
September 5, 2021
Irċevut
August 6, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to seasonal changes.

#77 · Expired

Data effettiva
July 25, 2021
Irċevut
July 13, 2021
Data ta' tmiem
December 31, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 25 July 2021. To amend Timetable.

#76 · Expired

Data effettiva
May 17, 2021
Irċevut
May 11, 2021
Data ta' tmiem
October 1, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 17 May 2021. To amend Timetable.

#75 · Expired

Data effettiva
March 29, 2021
Irċevut
March 23, 2021
Data ta' tmiem
October 1, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 29 March 2021. To amend Timetable.

#74 · Expired

Data effettiva
March 8, 2021
Irċevut
March 2, 2021
Data ta' tmiem
October 1, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 08 March 2021. To amend Timetable.

#73 · Expired

Data effettiva
January 24, 2021
Irċevut
January 19, 2021
Data ta' tmiem
October 1, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 24 January 2021. To amend Timetable.

#72 · Expired

Data effettiva
November 2, 2020
Irċevut
October 27, 2020
Data ta' tmiem
January 4, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 02 November 2020. To amend Timetable.

#71 · Expired

Data effettiva
August 30, 2020
Irċevut
August 27, 2020
Data ta' tmiem
January 4, 2021

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 30 August 2020. To amend Timetable.

#70 · Withdrawn

Data effettiva
August 30, 2020
Irċevut
August 25, 2020

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised registration due to the Coronavirus pandemic.

#69 · Expired

Data effettiva
July 5, 2020
Irċevut
July 3, 2020
Data ta' tmiem
September 30, 2020

SK_1_1A · Skegness InterchangeChapel St Leonards

Further Temporary suspension of service due to COVID19

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 05 July 2020. To amend Timetable.

#68 · Expired

Data effettiva
March 26, 2020
Irċevut
March 26, 2020
Data ta' tmiem
August 31, 2020

SK_1_1A · Skegness InterchangeChapel St Leonards

Temporary suspension of service due to COVID19

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 26 March 2020. To amend Timetable.

#67 · Registered

Data effettiva
April 4, 2020
Irċevut
February 21, 2020

SK_1_1A · Skegness InterchangeChapel St Leonards

2020 Seasonal schedule introduced based upon a new four phase frequency plan, Bronze, Silver, Gold, Plantinum. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 04 April 2020. To amend Timetable.

#66 · Registered

Data effettiva
October 28, 2019
Irċevut
September 13, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

Introduction of winter timetable. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 28 October 2019. To amend Timetable.

#65 · Registered

Data effettiva
November 4, 2019
Irċevut
August 19, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

Introduction of winter timetable. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 04 November 2019. To amend Timetable.

#64 · Registered

Data effettiva
September 2, 2019
Irċevut
July 19, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

Introduction of low season timetable. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1A effective from 02 September 2019. To amend Timetable.

#63 · Registered

Data effettiva
May 25, 2019
Irċevut
April 12, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

Summer Season Timetable introduced. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 25 May 2019. To amend Timetable.

#62 · Registered

Data effettiva
April 6, 2019
Irċevut
February 21, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

Spring Season Timetable introduced. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1A effective from 06 April 2019. To amend Timetable.

#61 · Registered

Data effettiva
January 20, 2019
Irċevut
January 10, 2019

SK_1_1A · Skegness InterchangeChapel St Leonards

To re-time one afternoon journey to improve punctuality.Supported by Lincolnshire County Council, Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 20 January 2019. To amend Timetable.

#60 · Registered

Data effettiva
October 29, 2018
Irċevut
September 21, 2018

SK_1_1A · Skegness InterchangeChapel St Leonards

Winter Season 2018 timetable.Supported by Lincolnshire County Council, Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 29 October 2018. To amend Timetable.

#59 · Registered

Data effettiva
September 3, 2018
Irċevut
July 23, 2018

SK_1_1A · Skegness InterchangeChapel St Leonards

Reinstate Low Season 2018 Timetable, Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1A effective from 03 September 2018. To amend Timetable.

#58 · Withdrawn

Data effettiva
September 3, 2018
Irċevut
July 20, 2018

SK_1_1A · Skegness InterchangeChapel St Leonards

Reinstate Low Season 2018 Timetable, Hail and ride on all sections of route where safety conditions allow.

#57 · Registered

Data effettiva
May 26, 2018
Irċevut
March 28, 2018

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised High Season 2018 Timetable, Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 26 May 2018. To amend Timetable.

#56 · Registered

Data effettiva
March 26, 2018
Irċevut
January 29, 2018

SK_1_1A · Skegness InterchangeChapel St Leonards

Revised Low Season 2018 Timetable, Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1A effective from 26 March 2018. To amend Timetable.

#55 · Registered

Data effettiva
October 30, 2017
Irċevut
August 30, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

Winter Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 effective from 30 October 2017. To amend Timetable.

#54 · Withdrawn

Data effettiva
October 30, 2017
Irċevut
August 30, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

Winter Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

#53 · Registered

Data effettiva
September 4, 2017
Irċevut
July 11, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

Low Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

#52 · Withdrawn

Data effettiva
September 4, 2017
Irċevut
July 7, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

Low Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

#51 · Registered

Data effettiva
May 27, 2017
Irċevut
March 31, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

High Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1 effective from 27 May 2017. To amend Timetable.

#50 · Registered

Data effettiva
April 1, 2017
Irċevut
February 3, 2017

SK_1_1A · Skegness InterchangeChapel St Leonards

Spring Season 2017 timetable. Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number SK_1_1A / 1 / 3 / 1A / 1 effective from 01 April 2017. To amend Timetable.

#49 · Registered

Data effettiva
January 2, 2017
Irċevut
November 4, 2016

1 · Skegness InterchangeChapel St Leonards

Revise winter timetable from January. Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1 / 3 / 1 effective from 02 January 2017. To amend Timetable.

#48 · Registered

Data effettiva
October 31, 2016
Irċevut
October 10, 2016

1 · Skegness InterchangeChapel St Leonards

To re-instate previous timetable at the request of Lincolnshire County Council. Supported by Andrew Addo-Smith of Lincs CC. Hail and ride on all sections of route where safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1/1/3 effective from 31-Oct-2016. To amend Timetable.

#47 · Registered

Data effettiva
October 31, 2016
Irċevut
September 5, 2016

1 · Skegness InterchangeChapel St Leonards

Low Season 2016 timetable introduced. The section of route between Skegness Interchange and Roman Bank (Fantasy Island) will operate at Frequent Intervals as detailed in the enclosed additional doc. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1/1/1A/3 effective from 31-Oct-2016. To amend Timetable.

#46 · Registered

Data effettiva
September 5, 2016
Irċevut
July 8, 2016

1 · Skegness InterchangeChapel St Leonards

Low Season 2016 timetable introduced. The section of route between Skegness Interchange and Roman Bank (Fantasy Island) will operate at Frequent Intervals as detailed in the enclosed additional doc. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1/1/1A/3 effective from 05-Sep-2016. To amend Route and Timetable.

#45 · Registered

Data effettiva
May 28, 2016
Irċevut
March 31, 2016

1 · Skegness InterchangeChapel St Leonards

High Season 2016 Timetable Introduced. The section of route between Skegness Interchange and Roman Bank (Fantasy Island) will operate at Frequent Intervals as detailed in the enclosed additional doc. Hail & Ride where traffic and safety conditions allow.

Operating between Skegness Interchange and Chapel St Leonards given service number 1/1/3 effective from 28-May-2016. To amend Timetable.

Data uffiċjali pubblika Traffic Commissioner. Snapshot aġġornat Sep 8, 2026. Traffic Commissioners / DVSA · CC BY ↗